灌注桩成桩后桩底溶洞处理技术

Treatment Technology of Karst Cave at the Bottom of Cast-in-place Pile

  • 摘要: 本文对成桩后溶洞处理技术进行研究,提出在桩身钻多个孔与溶洞形成连通,并采用高压旋喷和静力注浆结合的方式对桩底后揭露溶洞进行加固处理,并以中山某实际工程为例,阐述了桩底溶洞连通注浆加固的原理,提出了注浆钻孔数量、旋喷压力等参数的控制要点,总结了灌注桩桩底后揭露溶洞处理技术工艺流程、关键环节,本项目处理后的桩底水泥浆芯样不小于13.7MPa,桩基静载承载力不小于4367kN,均满足设计要求,项目验证该技术实施效果良好,可为其他类似桩端后揭露溶洞的处理施工提供参考。

     

    Abstract: This paper studied the treatment technology of the karst cave excavated by core-pulling test after the pile was completed. It is proposed to drill multiple holes in the pile body to form a connector through the karst cave, and proposed to combine high-pressure rotary grouting and static grouting to reinforce the exposed karst cave at pile bottom. Based on the application of an actual project in Zhongshan, The principle of connecting grouting for reinforcement of karst cave at pile bottom was expounded. The control points of parameters such as the number of grouting holes and the pressure of rotary jet injection were put forward. The process and key links of the treatment technology of exposed cave after pouring pile bottom were summarized. After the treatment of this project, the cement slurry core samples at the bottom of the pile are not less than 13.7MPa, and the static load capacity of the pile foundation is not less than 4367kN, which all meet the design requirements. The implementation of this technology is effective and can provide reference for other similar projects.

     

/

返回文章
返回