高级检索

基于BIM的凹型立面建筑附着式升降脚手架的施工与安全管理

Construction and Safety Management of Attached Lifting Scaffold for Concave Facade Buildings Based on BIM

  • 摘要: 近年在高层建筑施工中,附着式升降脚手架因其更高的安全性和经济性已逐渐替代传统落地式脚手架,得到了广泛的应用,但在不规则截面建筑的应用中却存在技术难题。本文以外立面存在内凹结构的粤科科技金融大厦项目为案例,研究BIM技术在凹型立面建筑中的应用。分析结果表明,BIM技术通过建立三维信息模型规范化管理附着式升降各脚手架的各构件,清晰展示各节点连接细节,提升工人的安装效率;另外,针对本项目内凹结构变化,利用BIM技术设计一种带有可移动钢板的特制立柱,既可以用作附着式升降脚手架的附墙支点,又可以在凹型截面导致导轨的坡度变化时,上下移动立柱上的钢板,适配架体的水平附墙杆件;同时,可以利用BIM模型的可视化对项目危险源进行安全交底,提升安全管理能力。

     

    Abstract: Presently, in high-rise building construction, the attached lifting scaffold has gradually replaced the traditional floor-type scaffold and has been widely used because of its higher safety and economy, but there are technical problems in the utilization of irregular cross-section buildings.This paper studies the utilization of BIM technology in the special structure building with irregular cross section, taking the Yueke Science and Technology Finance Building project with internal structure on the outer facade as a case.The analysis results show that BIM technology can standardize the management of the components of the attached lifting scaffold by establishing a three-dimensional information model, clearly display the connection details of each node, and improve the installation efficiency of workers; In addition, in view of the change of the concave structure of the project, a special column with movable steel plate is designed using BIM technology, which can be used as the wall-attached pivot of the attached lifting scaffold, and can also move the steel plate on the column up and down to fit the horizontal wall-attached member of the frame when the slope of the guide rail changes due to the change of section; At the same time, the visualization of BIM model can be used to carry out safety disclosure of project hazard sources and improve the safety management ability.

     

/

返回文章
返回